Resource Type

Journal Article 1078

Conference Videos 44

Year

2024 2

2023 69

2022 97

2021 106

2020 57

2019 60

2018 71

2017 72

2016 50

2015 53

2014 63

2013 36

2012 35

2011 43

2010 52

2009 28

2008 53

2007 38

2006 22

2005 17

open ︾

Keywords

management 49

engineering management 39

process 28

project management 23

construction management 15

sustainable development 12

China 11

optimization 11

risk management 11

innovation 9

management system 8

Anammox 7

Machine learning 6

construction 6

engineering 6

thermal management 6

emergency management 5

knowledge management 5

process intensification 5

open ︾

Search scope:

排序: Display mode:

The Research of Business Process Management-based on The Changqing Oil Field Cooperation Project

Ning Hui,Xiao-wei Zhou,Qing-qing Chang

Frontiers of Engineering Management 2015, Volume 2, Issue 2,   Pages 182-187 doi: 10.15302/J-FEM-2015027

Abstract: Oilfield Cooperation Management Project in an attempt to improve future cooperative efforts.The paper focuses on the drawbacks in the existing management process and analyzes the process by usingcurrent information management methods.

Keywords: cooperation project     process optimization     management     improvement    

Research of Collaborative Design Process Management Based on Activity Method

Hao Yongping,Zhang Jianfu,Shi Chunjing,Shao Weiping

Strategic Study of CAE 2005, Volume 7, Issue 12,   Pages 69-73

Abstract:

By analyzing the components of an activity and the relationship of the process modeling, a topologicalstructure of the collaborative design process management system was presented.According to the situation and characteristic of the product development process, a number of the importantissues about process modeling, AU design environment, process monitoring and the data exchange betweenAt last, a user interface of the collaborative design environment and the display of process monitoring

Keywords: activity theory     activity unit     process modeling     design process management    

Process safety management considerations for biofuel production

Hao WU, Igor PEÑARRUBIA, Lin CUI, Jinsong ZHAO

Frontiers of Engineering Management 2017, Volume 4, Issue 3,   Pages 357-367 doi: 10.15302/J-FEM-2017025

Abstract: A process hazard analysis (PHA) method, namely the hazard and operability study (HAZOP), is first usedThis method is an ethanol distillation and dehydration process.The case study reveals that potential high-level risks exist in the current biofuel process design and

Keywords: biofuel     HAZOP     PHA     risk management    

Research and practice on system engineering management of a mobile payment project

Yongkai ZHOU, Hongfeng CHAI

Frontiers of Engineering Management 2017, Volume 4, Issue 2,   Pages 127-137 doi: 10.15302/J-FEM-2017011

Abstract: A rapid iterative development process is adopted to improve the product release efficiency as well as

Keywords: systems engineering     mobile payment     engineering management method     Mobile QuickPass     national informationsecurity     rapid iteration process     financial security     coordination and cooperation    

Applying system dynamics to strategic decision making in construction

SangHyun LEE

Frontiers of Engineering Management 2017, Volume 4, Issue 1,   Pages 35-40 doi: 10.15302/J-FEM-2017002

Abstract: framework that integrates System Dynamics and Discrete Event Simulation for a strategic decision making process

Keywords: strategic project management     construction management     system dynamics     feedback process     hybrid simulation    

Project management maturity in construction consulting services: Case of Expo in China

Yongkui LI, Qing YANG, Yan ZHANG

Frontiers of Engineering Management 2020, Volume 7, Issue 3,   Pages 384-395 doi: 10.1007/s42524-019-0070-z

Abstract: For many years, project management maturity models (PMMM) derived from the software industry have broughtMoreover, professionals have gradually realized the importance of non-process factors (e.g., teamworkThis study describes the construction of PMMM for CCS that considers non-process factors and combinesthem with CCS-specific process factors.To verify the effectiveness of the proposed model, we conduct a case study on the overall project management

Keywords: construction consulting services     project management maturity model     non-process factors     Expo    

Management problems in development process of remanufacturing industry

Xu Binshi

Strategic Study of CAE 2012, Volume 14, Issue 12,   Pages 10-14

Abstract: Remanufacturing in China is still in its early stage and faces pressures from society, policy, technology and managementConsidering the actual states of remanufacturing in China, this paper researched several key managementBased on need analysis on trend of development of remanufacturing in China, six key management problemswere mainly researched, and they were: risk management of remanufacturing players, remanufacturing productionmana gement, remanufacturing quality management, authentication mode of remanufacturing in China, subsidy

Keywords: remanufacturing     industry development     management problems    

Optimization of fuel supply map during starting process of electronic controlled diesel engine

LIANG Jinguang, YU Xiumin, GAO Yue, WANG Yunkai, YU Hongyang, Gong Baoli

Frontiers in Energy 2008, Volume 2, Issue 4,   Pages 410-415 doi: 10.1007/s11708-008-0080-8

Abstract: Tests were conducted to study influence of fuel supply map during the starting process of an electronicwhich was made up of a CA498Z diesel engine, a VP37 electronic controlled distributor injection pump managementThe calibration process of starting fuel supply map was educed under the principle of low HC emission

Keywords: supply     management     CA498Z     process     controlled distributor    

Computer aided process planning system based on workflow technology and integrated bill of material tree

LU Chun-guang, MENG Li-li

Frontiers of Mechanical Engineering 2006, Volume 1, Issue 3,   Pages 305-312 doi: 10.1007/s11465-006-0039-6

Abstract: It is extremely important for procedure of process design and management of process data for productlife cycle in Computer Aided Process Planning (CAPP) system, but there are many shortcomings with traditionalTaking integrated BOM as the thread, CAPP systematic technological process is analyzed.Based on it, the key technologies of workflow management device were analyzed.encoding, organization node design of integrated BOM tree, transformation from Engineering BOM (EBOM) to Process

Keywords: PBOM     systematic technological     implementation technology     management     workflow technology    

Generic and SME-specific factors that influence the BIM adoption process: an overview that highlights

Elodie HOCHSCHEID, Gilles HALIN

Frontiers of Engineering Management 2020, Volume 7, Issue 1,   Pages 119-130 doi: 10.1007/s42524-019-0043-2

Abstract: Building information modeling/management (BIM) is an emerging technological and procedural shift in theIn this study, we use an extensive state-of-the-art method to clarify the BIM adoption process and theinfluence BIM adoption and then unify all these studies in one coherent and consistent BIM adoption process

Keywords: BIM     adoption     diffusion     implementation     change management     SMEs     literature review     architecture firms    

Development and Suggestion on the Comprehensive Automation of Process Industry

Huang Dao,Li Guanghua

Strategic Study of CAE 2000, Volume 2, Issue 12,   Pages 52-58

Abstract: describes it in concepts, and discusses the key problems which should be paid attention to during its process

Keywords: process industry     CIMS     comprehensive automation     product data management (PDM)    

Effect of catalyst layer mesoscopic pore-morphology on cold start process of PEM fuel cells

Ahmed Mohmed DAFALLA, Fangming JIANG

Frontiers in Energy 2021, Volume 15, Issue 2,   Pages 460-472 doi: 10.1007/s11708-021-0733-4

Abstract: Water transport is of paramount importance to the cold start of proton exchange membrane fuel cells (PEMFCs). Analysis of water transport in cathode catalyst layer (CCL) during cold start reveals the distinct characteristics from the normal temperature operation. This work studies the effect of CCL mesoscopic pore-morphology on PEMFC cold start. The CCL mesoscale morphology is characterized by two tortuosity factors of the ionomer network and pore structure, respectively. The simulation results demonstrate that the mesoscale morphology of CCL has a significant influence on the performance of PEMFC cold start. It was found that cold-starting of a cell with a CCL of less tortuous mesoscale morphology can succeed, whereas starting up a cell with a CCL of more tortuous mesoscale morphology may fail. The CCL of less tortuous pore structure reduces the water back diffusion resistance from the CCL to proton exchange membrane (PEM), thus enhancing the water storage in PEM, while reducing the tortuosity in ionomer network of CCL is found to enhance the water transport in and the water removal from CCL. For the sake of better cold start performance, novel preparation methods, which can create catalyst layers of larger size primary pores and less tortuous pore structure and ionomer network, are desirable.

Keywords: cold start     energy conversion     fuel cells     mesoscale morphology     tortuosity     water management    

Establishing Profiles for Systems Engineering Standards: A Great Help for Companies to Manage Their Processes

Rui Xue,Claude Baron,Philippe Esteban,Qiang Zhang

Frontiers of Engineering Management 2014, Volume 1, Issue 3,   Pages 297-303 doi: 10.15302/J-FEM-2014036

Abstract: In this paper, we discuss how to establish profiles of system engineering standards for companies. To define an appropriate system engineering standard for a company, this paper presents a detailed comparison between the current releases of the main system engineering sta-ndards (ANSI/ EIA-632, ISO/IEC-15288 and IEEE-1220), and explains how to choose the most adapted one according to the company practices. When no standard completely corresponds, the paper illustrates how to elaborate a tailor-made standard on the basis of specific required characteristics of the company or of the project, following a multi-standard approach, leading to extend and adapt a sta-ndard by importing some elements from another.

Keywords: system engineering     analysis     comparison     systems engineering management     process     multi-standards approach    

Practical evaluation for water utilities in China by using analytic hierarchy process

Hong CHEN,Feng XIAO,Zhe BI,Ping XIAO,Dongsheng WANG,Ming YANG

Frontiers of Environmental Science & Engineering 2015, Volume 9, Issue 1,   Pages 131-137 doi: 10.1007/s11783-014-0718-1

Abstract: In this paper, we proposed a practical evaluation method based on the analytic hierarchy process (AHPThe risk management can be applied through specific software packages with a user-friendly interface,believe this method will improve and play a more and more active role in the development of the risk management

Keywords: analytic hierarchy process (AHP)     risk management     water quality failure     water quantity failure    

Revolutionizing heat transport enhancement with liquid metals: Proposal of a new industry of water-free heat exchangers

Haiyan LI, Jing LIU

Frontiers in Energy 2011, Volume 5, Issue 1,   Pages 20-42 doi: 10.1007/s11708-011-0139-9

Abstract: Some liquid metals and their alloys, which have previously received little attention in thermal managementmodern heat transport processes: serving as heat transport fluid in industries, administrating thermal management

Keywords: heat exchanger     liquid metal     water resource     heat transport enhancement     coolant     thermal management     process    

Title Author Date Type Operation

The Research of Business Process Management-based on The Changqing Oil Field Cooperation Project

Ning Hui,Xiao-wei Zhou,Qing-qing Chang

Journal Article

Research of Collaborative Design Process Management Based on Activity Method

Hao Yongping,Zhang Jianfu,Shi Chunjing,Shao Weiping

Journal Article

Process safety management considerations for biofuel production

Hao WU, Igor PEÑARRUBIA, Lin CUI, Jinsong ZHAO

Journal Article

Research and practice on system engineering management of a mobile payment project

Yongkai ZHOU, Hongfeng CHAI

Journal Article

Applying system dynamics to strategic decision making in construction

SangHyun LEE

Journal Article

Project management maturity in construction consulting services: Case of Expo in China

Yongkui LI, Qing YANG, Yan ZHANG

Journal Article

Management problems in development process of remanufacturing industry

Xu Binshi

Journal Article

Optimization of fuel supply map during starting process of electronic controlled diesel engine

LIANG Jinguang, YU Xiumin, GAO Yue, WANG Yunkai, YU Hongyang, Gong Baoli

Journal Article

Computer aided process planning system based on workflow technology and integrated bill of material tree

LU Chun-guang, MENG Li-li

Journal Article

Generic and SME-specific factors that influence the BIM adoption process: an overview that highlights

Elodie HOCHSCHEID, Gilles HALIN

Journal Article

Development and Suggestion on the Comprehensive Automation of Process Industry

Huang Dao,Li Guanghua

Journal Article

Effect of catalyst layer mesoscopic pore-morphology on cold start process of PEM fuel cells

Ahmed Mohmed DAFALLA, Fangming JIANG

Journal Article

Establishing Profiles for Systems Engineering Standards: A Great Help for Companies to Manage Their Processes

Rui Xue,Claude Baron,Philippe Esteban,Qiang Zhang

Journal Article

Practical evaluation for water utilities in China by using analytic hierarchy process

Hong CHEN,Feng XIAO,Zhe BI,Ping XIAO,Dongsheng WANG,Ming YANG

Journal Article

Revolutionizing heat transport enhancement with liquid metals: Proposal of a new industry of water-free heat exchangers

Haiyan LI, Jing LIU

Journal Article